Investing in Redbridge: Building for the Future

Redbridge Council is delivering a series of ambitious improvement projects across the borough – enhancing leisure centres, schools, libraries, and community spaces. From vital safety upgrades to exciting new facilities, each development is designed to support local growth, improve public services, and create welcoming, modern environments for residents of all ages. Explore the latest updates and see how we’re building a stronger, more vibrant Redbridge for the future.

Fullwell Cross Leisure Centre

Swimming Pool Update

Swimming pool and fitness suite update

Progress on the replacement of the roof structure at Fullwell Cross Leisure Centre will soon accelerate following the award of the main works contract.

In recent months, we’ve been carrying out detailed surveys and specialist assessments, and going to the market to secure a specialist contractor. Appointing the right contractor for a complex project of this nature can take time, but it’s essential to ensure the works are delivered safely and to the required standard.

With the design and tender phases now complete, the forthcoming works include the safe removal of the defective RAAC concrete roof, which regrettably led to the closure of the pool and fitness suite. The project will deliver a brand‑new roof, extending the lifespan of the building and significantly improving its environmental performance. Once the new roof is in place, the interior will also be redecorated and refreshed.

It is expected that the pool and fitness suite will re‑open to the public in Summer 2027.

What’s Open

While the pool & fitness suite remains closed, many parts of the centre are still open:

  • Reception, and studio spaces are fully operational
  • Group exercise classes continue in Studio 1 and the Sam Ryan Studio
  • Swimming sessions have been relocated to Loxford and Mayfield Leisure Centres
  • A refurbished spa, including a new sauna and upgraded changing rooms. Read more on the Vision website

We appreciate your patience and continued support as we work to bring back a safe and welcoming pool environment for everyone

Find out more about Fullwell Leisure Centre

Kenneth More Theatre

Building Update

We’re delighted to announce that the Kenneth More Theatre will reopen this December 2026 following a major refurbishment, bringing full‑scale theatrical performances back to the heart of Ilford. Please read the full story.

During the closure, the theatre’s bars, foyers and studio spaces have remained open and available for hire, helping to keep the spirit of performance and creativity alive.

Venue Hire and Alternative Options

Kenneth More Theatre continues to support the local arts and community:

  • The ground floor bar and foyer is available for meetings, events, and community activities
  • Additional technical support is available upon request

To enquire about hiring space, please contact the KMT team or call 020 8708 8800.

For those seeking alternative venues, Redbridge Drama Centre in South Woodford is fully open and offers studio hire, classes, and theatre performances.

Project Progress: Where we’re now

The theatre’s structural works are nearing completion, and the theatre will come back better than ever with new decor, carpets, new seating, and a newly redecorated foyer.

A pop-up panto will be performed in the foyer ahead of the main auditorium opening on New Year’s Eve, with a special show.

We look forward to raising the curtain once again and bringing live performance back to the heart of Ilford.

What’s coming up?

A pop-up panto will be performed in the foyer ahead of the main auditorium opening on New Year’s Eve, with a special show.

  • First up is the return of Pop‑up Panto, Jack and the Beanstalk, taking place in the theatre foyer. Tickets are on sale now.
  • Our grand opening New Year’s Eve show – Curtain Up! Celebrate Act 2 – will be on sale very soon. Visit our Book a Show page for more details.

Thank you for your patience and continued support.

Find out more about Kenneth More Theatre.

Redbridge Cycling Centre

Track Maintenance Update

Following the end of the summer season, Redbridge Cycle Centre was temporarily closed to allow for essential maintenance and resurfacing of the track. This well-loved facility welcomes thousands of visitors each year and it’s vital that we keep the track in excellent condition for all users.

As part of the upgrade, a state-of-the-art membrane has been installed beneath the asphalt on the top circuit to enhance durability and extend the life of the surface.

To carry out these improvements safely and effectively, the cycling and BMX tracks were closed during the works period.

Current Progress

  • We are pleased to confirm that repair works on both the BMX, upper and lower tracks are now complete and fully open to users.
  • The works have addressed previous surface issues and improved overall track quality to ensure a safer and more enjoyable experience for cyclists.

We appreciate the patience and understanding shown by our hirers, clubs and regular users throughout this period of improvement works.

South Woodford Library and Gym

Building Update

Following a routine structural assessment, Reinforced Autoclaved Aerated Concrete (RAAC) was identified in the roof of South Woodford Library and Gym. This material has been the subject of national safety guidance, and in line with that advice, we’ve taken the precautionary step to close the building while we carry out further investigations and plan essential repairs.

For everyone’s safety, the building will remain closed until the works are complete.

Services Still Available

We’re committed to keeping you active, connected, and supported during this time:

  • Gym and studio sessions have been temporarily relocated to Redbridge Drama Centre
  • A pop-up library is now available, offering:
    • A curated selection of popular books
    • A dedicated children’s area
    • PC access and printing facilities

Looking for more? Visit the newly refurbished Woodford Green Library and Gym, now open with:

  • Extended hours:
    • Monday & Friday: 6am–10pm
    • Tuesday–Thursday: 6am–10:30pm
    • Weekends: 8am–8pm
  • Upgraded gym equipment
  • Improved public computer access
  • A welcoming space for all ages

Project Progress: Where we’re now

The library and gym will be reopening soon. The structural works are nearing the end, and the building will soon be having the final touches added, lights installed and redecoration with new fitness equipment. Read the full news story on South Woodford Library & Gym.

Wanstead High School and Leisure Centre

Expansion

A new skatepark for Hainault

The brand‑new skate park at Forest Road Recreation Ground, Hainault, is officially open. The upgraded facility replaces the much‑loved park that served the community for more than 20 years.

Why we’re building it

For two decades, the skatepark at the junction of Forest Road and Elmbridge Road has been a hub for young people, home to countless tricks from handplants to tail grabs on its iconic vertical half-pipe.

Following a recent inspection, however, the structure was deemed unsafe and has now closed. While repairs kept it going for many years, the time has come to retire the old park and look ahead to something bigger, safer, and better.

 

Designed with the community

This isn’t just a replacement — it’s an opportunity to reimagine what a skatepark can be. Redbridge Council and Vision RCL are committed to co-designing the new facility with local residents and skaters, ensuring it reflects the needs, creativity, and spirit of the community.

 

Progress so far

  • Public consultation gathered ideas on features, layout, accessibility, and visibility
  • Our appointed design-and-build contractor has submitted the final design concept
  • Preparations are underway to mobilise on site and begin construction

 

Looking ahead

The new skatepark in Hainault is scheduled to open in Spring 2026.

 

While you wait

Alternative skate facilities are available nearby in Seven Kings and Romford. We’ll continue engaging directly with local skaters and park users to shape the new site — so when it opens, it will be even better than before.